Lyon, travaux au canal de Jonage: Machine à damer
11 Reviews
1897
1min
A group of workers, aided by a steam-roller, are leveling the ground during the construction of the Jonage canal, a diversion of the Rhône river, which was built in order to supply the hydroelectric plant of Cusset.
Storyline
A group of workers, aided by a steam-roller, are leveling the ground during the construction of the Jonage canal, a diversion of the Rhône river, which was built in order to supply the hydroelectric plant of Cusset.
Released
1897
Runtime
1min
Director
Status
Released
Language
French
Production
Lumière
Genre